Rochester, Michigan

Rochester renovation for the old downtown grid

The city itself is small, a few dozen blocks wrapped by a much larger township, with Paint Creek and the trail running through the middle of it. Houses on those streets date to the late 1800s and early 1900s: narrow rooms, a back stair off the kitchen, plaster over lath, and almost always an addition from the 1950s hanging off the rear.

CountyOakland
Core housing1890s to 1920s
Common findingA weaker 1950s addition
Review timeAdds weeks before a start

The 1950s addition is rarely built like the house

Original construction on this grid is heavy. Full-dimension lumber, balloon framing, a fieldstone or brick foundation and first-floor ceilings near nine feet. Then somebody added a rear room in 1954, and the standard drops immediately: shallow footings or block piers, joists that span farther than they should, a rim with no insulation, and a threshold that steps down an inch and a half into the new space.

You feel it before you measure it. The floor moves under a washing machine, the back door sticks in August, and the ceiling in that room has a hairline crack that keeps coming back after every patch. Opening the wall between the original house and that addition is the moment the difference stops being cosmetic, and it reshapes the budget on a good share of our Oakland County projects.

Sequence solves it. Footings and framing get corrected first, the floor gets leveled to the original house, and only then do cabinets, tile and trim get ordered. Doing that in the other order produces a beautiful room sitting on a structure that will move again next winter. Anything scoped as a first-floor addition here gets that inspection before a number goes on paper.

The rest of the plan carries its own puzzles. Rooms are small and separate, a chimney often sits in the middle of the floor, and the back stair eats the corner of the kitchen where the work surface wants to be. Removing that stair is sometimes right and sometimes impossible, depending on how the second floor is reached.

Kitchens with a stair in the corner

Once the back stair question is settled, layout follows quickly. These rooms are usually long and narrow, so a kitchen island works only after the walking lanes are checked against the door swings. Full kitchen remodeling in an older house also means finding a vent path for the hood through a plaster ceiling.

Baths carved out of a bedroom

Second floors here were built with one bathroom and no closets worth the name. New bathrooms come out of a bedroom corner or the head of the hall, with the drain routed down an interior wall rather than an exterior one. A steam shower needs framing and vapor control planned early, and general bathroom renovation covers the rest.

Stone basements near the creek

Low blocks toward Paint Creek carry a higher water table, so drainage, sump routing and discharge come before any framing goes up. Handled properly, a fieldstone basement holds temperature well, which is why a wine cellar fits down there. Broader basement finishing starts with the moisture plan.

Additions that match the original

Roof pitch, window proportion, siding exposure and trim depth are what make a rear addition disappear or announce itself. On a house from 1905, matching means milled stock rather than stock profiles. Our home addition services begin with elevations drawn against photographs of the existing house.

Porches, walks and the back yard

Front porches on these streets are structural and visible, and a sagging column base is usually rot at the beam rather than settlement. Rear yards are small, so a compact patio and lighting do more than a large deck would. See our outdoor projects.

North Oakland approvals and what they add

This is a premium market with a serious review process, and pretending otherwise only sets a homeowner up for a bad phone call in March. Exterior changes near the older core draw more scrutiny than interior ones, and the difference between a two-week and a ten-week approval usually comes down to how complete the first submission was.

What a realistic schedule accounts for before a crew arrives:

  • Design review on anything visible from the street, including windows, porches and roof lines
  • Structural documentation when an existing addition needs new footings or sistered framing
  • Drainage and grading questions on the low side of the grid toward the creek
  • Lead-safe work practices in housing built well before 1978
  • Ordering time for milled trim, sash and siding that no supplier keeps in stock

How the work runs from Ypsilanti

Rochester sits at the far corner of the Oakland County service area, roughly fifty miles from the Platt Road shop. Distance like that gets managed by scheduling longer site days in continuous blocks, staging materials in one delivery, and keeping a single lead carpenter on the house rather than rotating crews through it.

Everything from measure to final punch sits with one team. Drawings are priced by the people who swing the hammers, which is the practical reason design-build holds a number better than the draw-then-bid method does on a house full of unknowns behind the plaster.

Two nearby markets read differently. Rochester Hills surrounds the city with newer subdivision stock and far fewer surprises inside the walls, and Troy to the south is brick colonial and quad-level country from the 1960s and 1970s. The office is open Monday through Friday, 8:30 a.m. to 4:30 p.m. Phone (734) 540-0347 and we will arrange a site visit.

Contracting done Wright, from the stone foundation to the rear addition.