Basement bathroom remodel in Ann Arbor, MI

Featured project. Ann Arbor, Michigan

A basement bathroom that started by breaking the floor open

This basement bathroom remodel in Ann Arbor bought more than a bathroom. The same run of work produced a bedroom, a closet and new flooring across the living area, and the city signed the lower level off as space someone can actually live in. It began where every basement bath has to begin, with a concrete floor and a jackhammer.

LocationAnn Arbor, Michigan
ProjectBasement bathroom, bedroom and living area
InvestmentAbout $57,000
Completed2025
Finished basement bathroom in Ann Arbor with a navy tiled tub surround, a navy vanity with brass fittings and marble-look tile flooring
The finished room. Navy tile, brass fittings, and a floor that had to be cut open first.

The lower level this Ann Arbor home started with

The owner had just bought the house. The basement was dry and usable and completely unfinished, which is the most common version of this problem in Ann Arbor and across Washtenaw County: a whole floor of a house that counts for nothing because it has no bathroom, no bedroom and no finished surfaces. She wanted a bathroom down there. What she actually needed was for the lower level to become part of the house.

That distinction drives the budget more than any tile selection. A basement bathroom is not a small bathroom. It is a bathroom plus all the infrastructure a first-floor bath already has hidden in its walls and under its subfloor.

The scope was settled before a crew arrived, across three approved orders. Nothing was added once work started, which matters because the costs that surprise people almost always arrive mid job.

Basement bathroom rough-in with the concrete slab cut open and white PVC drain stubs standing in the trench
During construction. The slab was cut and jackhammered open so the drain lines could run where the fixtures needed them.

Why a basement bathroom remodel begins in the concrete

Water leaves a building by falling. A toilet, a shower and a sink on a basement floor all need drain lines below that floor, sloped, and tied into the existing house drain. On a slab there is only one way to get them there. You break the concrete, dig a trench, set the pipe, and fill it back in.

This slab fought back in ordinary ways. It was unusually thick, with metal ground into it, so the ramsets the crew normally relies on kept failing. Then a pipe turned up in the ground once the dust cleared. The trench was cut, the drains stubbed up where the fixtures would land, and the floor poured back in later in the run.

The city inspected that work before it disappeared. Rough building passed, then insulation, then the drainage connection on its own inspection, then rough plumbing, and finally the plumbing itself in May. That sequence is not optional and it is the part of a finished basement nobody sees, which is exactly why pulling the permit matters more here than almost anywhere else in a house.

Alcove tub with a navy stacked tile surround, brass handheld shower and brass tub filler in a finished basement bathroom
The tub and shower share one wall of navy stacked tile, run to the ceiling.

The one selection that changed the room

During selections, before any work started, the owner was offered a change order that would have taken just over two thousand dollars back off the price. All she had to do was accept a vinyl surround around the tub instead of tiled shower walls. She declined it and kept the tile.

That single decision is why the room reads the way it does. Navy stacked tile runs floor to ceiling around the tub, white grout lines hold straight across the whole wall, brass fittings sit against it, and two brass corner shelves break up the field. A vinyl surround would have been a perfectly serviceable shower and tub. It would not have been the reason anyone remembers this bathroom.

Navy stacked tile shower wall with two brass shower heads, a handheld on a slide bar and two brass corner shelves
A fixed head, a handheld on a slide bar, and brass corner shelves.

A bathroom, a bedroom and a living area in one run

While the plumbing was curing, the rest of the lower level went up. The bedroom was framed, the bedroom and closet drywalled, and an egress window went in, which is what lets a basement room count as a bedroom rather than storage with a bed in it. The requirements for a basement bedroom are the difference between finished square footage and wasted square footage.

Then the floors. New basement flooring went down through the bedroom, then across the living area, followed by trim, doors, door hardware and bifold closet doors. Large-format tile with heavy grey veining went into the bathroom itself, laid on the diagonal so the grout lines run against the walls rather than parallel to them.

Not everything went in on the first attempt. A 36-inch bedroom door showed up when the opening wanted a 30, so it went back. The vanity light and an HVAC vent were drawn for the same patch of ceiling, and one had to move. On the last day, with the new bulbs on, blemishes showed up in the drywall that work lights had hidden, so the crew skim coated them and came back to sand and repaint.

Navy blue bathroom vanity with brass hardware, a quartz top and a brass framed oval mirror in an Ann Arbor basement
The vanity picks up the navy from the tile wall opposite it.
Brushed brass widespread faucet and undermount sink set into a marble-look quartz vanity top
Brass on quartz, with an undermount basin and a matching pop-up drain.

How the finished lower level reads

The bathroom is the piece that gets photographed, and it earns it. A navy shaker vanity with real storage sits under a quartz top and a brass framed mirror, opposite the tiled tub wall, with the open joists overhead painted out black so the ceiling recedes instead of pressing down. The tile floor carries the same white and grey through the whole room.

The more valuable outcome is harder to photograph. On June 2 the city issued the certificate of occupancy, and it records the purpose of the work as creating space in the basement for someone to live in, with an egress window and a full bathroom. That is a guest suite in everything but name, and it is finished square footage that did not exist before.

Roughly six weeks of site work, and a lower level that counts. If you have a dry basement and no bathroom in it, that is the shape of the project, and our design build process exists to price it once and hold the number. See how other featured projects came together, then get in touch.

What this project included

Every line below was approved before the first day on site.

Demolition

The slab cut open

Concrete broken out and trenched so new drain lines could run under the floor.

Plumbing

Drains below the floor

Waste and water set to the fixture locations, then inspected before anything covered it.

Concrete

Floor poured back in

The trench backfilled and the slab repaired once the work underneath had passed.

Framing

Three rooms laid out

Walls framed for the bathroom, the bedroom and the closet.

Egress

A window that makes it a bedroom

Installed so the room counts as living space instead of storage.

Drywall

Insulated, boarded and painted

Insulation and board through the new rooms, inspected, then finished and painted.

Tile

Navy walls, marble-look floor

Stacked tile to the ceiling around the tub, large-format porcelain underfoot.

Fixtures

Vanity, quartz and brass

Navy vanity, quartz top, brass faucet, mirror and vanity lighting.

Finishes

Floors, trim and doors

Flooring across the bedroom and living area, then trim, hardware and bifold doors.

Across the board, every inspector and contractor friend said the same thing- that the work was tidy and excellently done. My home was treated with such care and respect (special shoutout to Nick who was wonderful- he left my workspace tidy and clean at the end of every single day, even after he had to jackhammer through a cement basement floor), and Connor would oftentimes answer my questions within minutes of me emailing him! I will go nowhere else but Wrights Renovations for all future projects- they have my business for life! Emily M., Ann Arbor, Michigan
Basement bathroom remodel, with Nick and Connor

Wright’s Renovations · featured projects

Explore more featured projects

See more of our Southeast Michigan work, from kitchens and baths to whole-home and commercial builds. Every one was planned and built by one team.

Finished basement bathroom in Ann Arbor with a navy tiled tub surround, a navy vanity with brass fittings and marble-look tile flooringBathroomAnn Arbor, MI

A bath, a bedroom and a slab that fought back

A basement bathroom, bedroom and living area, built after the concrete floor was cut open for drains.
Refinished wood deck in Ann Arbor with wide stained steps, a rebuilt ramp along the house and a cedar pergolaDeckAnn Arbor, MI

A deck sanded to bare wood and finished again

Two coats of old stain came off before anything went on. Then repairs, a fresh finish and a pergola.
Rebuilt staircase in an Ypsilanti home with black oak treads, cream risers, white balusters and black newel postsStaircaseYpsilanti, MI

A staircase taken back to its stringers

Another contractor built these stairs first. We found the stringers were the real fault and rebuilt from there.
Remodeled Ann Arbor kitchen with a white farmhouse sink under a picture window, quartz counters and a wood-look floorKitchenAnn Arbor, MI

A small kitchen rebuilt from the subfloor up

A full gut of 180 square feet: new subfloor, quartz counters, navy herringbone tile, a vented hood and a walk-in pantry.
Remodeled kitchen in Belleville with sage green cabinets and white quartz countertopsKitchenBelleville, MI

New cabinets, counters and backsplash

Every surface replaced in a Belleville kitchen: sage green cabinets, white quartz counters, subway tile backsplash and new LVP flooring.
Rear of an Ann Arbor home with cedar-wrapped posts and beams supporting a full-width deckExteriorAnn Arbor, MI

Rough-sawn cedar, post by post

Front porch and deck structure wrapped in cedar, stained, sealed and flashed against the weather.
Remodeled Ypsilanti laundry and mudroom with birch butcher block counters, white cabinets and green wallsLaundryYpsilanti, MI

Birch counters over a working laundry

Butcher block beside the sink and over the machines, open shelving and an in-wall wash box.
Remodeled three-season porch in Ypsilanti with new vinyl plank flooring and wicker seatingPorch and deckYpsilanti, MI

A porch and deck ready for every season

New plank floors inside, a Trex re-top and lit stairs outside, pest-proofed underneath.
Vaulted knotty pine ceiling with a chandelier and stone chimney in a remodeled Ypsilanti living roomLiving roomYpsilanti, MI

A ceiling worth looking up at

A knotty pine vault, new lighting and a hidden projector shelf for movie nights.
Rear exterior of a Saline home with a new mudroom addition, refreshed deck and breezeway to the garageAdditionSaline, MI

House and garage, finally connected

A post-and-beam mudroom and stepped breezeway, plus a new roof and re-topped deck.
Refinished Ypsilanti basement with a drop ceiling and wood-look plank flooringBasementYpsilanti, MI

A lower level made livable again

Insulated new walls, a fresh drop ceiling and plank floors that climb the stairs.
Remodeled Ann Arbor bathrooms with a tiled walk-in shower and a new tub bathBathroomAnn Arbor, MI

An upstairs and downstairs refresh

A tiled walk-in shower downstairs and a new tub bath upstairs, built together.
Remodeled Plymouth basement bathroom with a green vanity and a walk-in showerBathroomPlymouth, MI

A closet turned walk-in shower

A basement bath and closet became one room with a tiled bench and grab bars.
Remodeled Livonia bathroom with a floating vanity and backlit mirrorBathroomLivonia, MI

A spa-like bathroom retreat

A dated bath reborn with a marble-look walk-in shower and a backlit vanity.
Finished basement game room in Ypsilanti with knotty pine wallsBasementYpsilanti, MI

A basement that finally gets used

A knotty pine lower level reborn as a warm game room and bar.
Whole home addition in Ann Arbor with a new kitchen islandWhole homeAnn Arbor, MI

A cape cod grows up

An addition, a bigger kitchen and a finished basement, with the HVAC out of the crawl space.View project →
Whole home remodel in Ann Arbor with an open living and kitchen areaWhole homeAnn Arbor, MI

Kitchen addition, garage to bedroom, new deck

An addition off the kitchen, a garage converted to a bedroom, a new bath and a deck.View project →
Whole home remodel in Canton with a live-edge fireplace mantelWhole homeCanton, MI

Three floors refreshed

All-new trim, paint and flooring across three stories, with a remodeled kitchen and primary bath.View project →
Home office addition built over the garage of an Ann Arbor homeHome officeAnn Arbor, MI

An office and suite over the garage

A home office, a bedroom and a full bath added over the garage, with the yard left alone.View project →
Renovated reception area in a Troy commercial officeCommercialTroy, MI

A title office rebuilt around the work

A commercial office renovation that kept the business open while the space was rebuilt.View project →
Mudroom and laundry remodel in Brighton with custom cabinetsMudroomBrighton, MI

Mudroom, laundry and pantry

A cramped laundry closet became a connected mudroom, laundry room and walk-in pantry.View project →
Remodeled Ann Arbor kitchen with walnut slab base cabinets, white shaker wall cabinets, a terrazzo backsplash and matte black countersKitchenAnn Arbor, MI

A kitchen that pulled the whole floor with it

The kitchen came out, and the floor, stairs, windows and deck came with it. Twelve line items, one contract.View project →
Full bathroom renovation in Howell, MichiganBathroomHowell, MI

A full bathroom rebuild

A bathroom taken down to the studs and rebuilt, waterproofed and tiled to last.View project →
Two bathrooms and a finished basement in an Ann Arbor homeBathroomsAnn Arbor, MI

Two baths and a finished basement

A primary bath, a half bath and a finished basement, planned together on Marian Avenue.View project →
Whole home remodel in Plymouth Township with an updated kitchen and living spaceWhole homePlymouth Township, MI

A whole house brought current

A dated, wallpapered house reworked floor to floor into bright, modern living space.View project →
Bathroom remodel in Dexter with green tile, brass fixtures and a walk-in showerBathroomDexter, MI

Green tile and warm brass

A dated bath rebuilt around green tile, brass fixtures and a walk-in shower.View project →
Kitchen and bathroom remodel in Manchester with a bold navy kitchenKitchen & bathManchester, MI

A bold navy kitchen

A navy kitchen and refreshed baths in a whole-home update near Manchester.View project →
Kitchen remodel in Ypsilanti with new cabinetry, counters and an open layoutKitchenYpsilanti, MI

A hardworking kitchen, opened up

A closed-off, dated kitchen reworked into a bright, open room built to last.View project →