First floor and kitchen refresh in Dexter, MI

Featured project. Dexter, Michigan

A first floor refreshed without tearing out the kitchen

The Fishers wanted their Dexter first floor to feel new without the cost of new cabinets. We painted all 16 kitchen cabinets, topped them with quartz, replaced the kitchen lighting, updated the half bath and ran new vinyl plank across the whole main level.

LocationDexter, Michigan
ProjectKitchen, half bath and floors
Cabinets16 refinished in place
InvestmentAbout $39,000
BuiltWinter 2025

A first floor renovation in Dexter that kept the layout

This first floor renovation in Dexter, in western Washtenaw County, started with a sound layout and finishes that had worn out. The cabinet boxes were solid, the room worked and nobody wanted to move a wall. What needed to change was everything you see and touch: the cabinet color, the counters, the lights and the floor that ran through every room on the main level.

Will priced the job as one project with its own line for each step, so the Fishers could see exactly what the cabinet refinishing cost before anything started. Our kitchen remodeling page walks through the same choice between refresh and replace, and the design-build process explains how one team carries the job from selections to the final walkthrough.

What we built

A brighter kitchen and one floor from end to end

Dexter kitchen with white painted cabinets, white quartz countertops and vinyl plank floors running toward the living room
The kitchen

Painted cabinets under quartz

All 16 kitchen cabinets were sanded, filled, primed and finished in a durable white paint, then fitted with new hardware. A quartz countertop with a matching backsplash went on top, installed by our countertop partner.

The old kitchen lights came down and five can-less LED lights went up, plus a new fixture over the sink. Our kitchen lighting page covers fixtures like these. If you’re deciding between paint and new cabinets, the Plymouth cabinet project shows the replace path from start to finish.

Living room in a Dexter home with new vinyl plank floors, baseboard and green walls
The floors

Vinyl plank through the whole main level

We pulled the old flooring off the entire first floor and laid floating vinyl plank the Fishers had already bought, so the kitchen, living room, entry and hall now share one surface. New baseboard and quarter round finished every edge, and a change order during the job added a little more plank, demolition and trim where the rooms needed it.

Running one floor through the level is the simplest way to make a home feel connected without opening walls. Our kitchen flooring guide covers how vinyl plank holds up next to the sink and the back door.

The details

Quartz at the sink and new floors at the stair

The workstation sink sits in the new quartz under the window, with the matching backsplash running behind it. At the front of the house, the same plank floor carries into the entry and runs to the foot of the stair.

White quartz countertop with an undermount workstation sink and a brushed nickel faucet in a Dexter kitchen
New quartz around the workstation sink
Front hall and stair in a Dexter home with new vinyl plank flooring and baseboard
The new floor in the front hall below the stair

A half bath, updated at the same time

The half bath near the kitchen got the same treatment on a smaller scale: the vanity was refinished, a new top, backsplash and sink went on and a new light fixture went in. Our powder room page has more ideas for a small bath that guests actually see.

The whole level

One floor from the kitchen to the front door

Quartz peninsula with drawers and the sink run under a window in a Dexter kitchen remodel
The quartz peninsula and sink run under the window
Entry with a front door, stair and new vinyl plank floor in a Dexter first floor renovation
The entry and stair on the same new floor

In her words

What the homeowner said

Kristi F. left this Google review after the work wrapped. It’s printed here in full, word for word.

Wright’s Renovations did a great job on our first floor renovation. Their clear communication, and quality of work were great from start to finish.

Kristi F.
First floor renovation client, Google review

Wondering if refinishing is enough for your kitchen?

Tell us what’s bothering you about the space. We’ll look at what’s worth keeping, price the refresh and the replacement side by side and let you choose.

The scope, line by line

This is what the signed proposal and its three approved change orders covered, about $39,000 in all.

Demolition

Floors, lights and counters

The old first floor flooring, the kitchen lights and the kitchen and bath countertops removed and hauled away.

Cabinets

16 cabinets refinished

Sanded, filled, primed and painted in a durable finish, with new hardware installed.

Counters

Quartz with a matching backsplash

Fabricated and installed by our countertop partner over the refinished cabinets.

Electrical

New kitchen lighting

Five can-less LED lights, a new fixture over the sink and a new light in the half bath.

Half bath

Vanity refinished, top replaced

Vanity painted, with a new top, backsplash and sink from our countertop partner.

Floors

Vinyl plank, first floor wide

Floating vinyl plank supplied by the homeowners and installed through the main level.

Trim

Baseboard and quarter round

New trim wherever the floor changed, filled, caulked and ready for paint.

Repairs

Drywall patched before start

Damaged drywall repaired and primed through a pre-project change order.

Questions we hear

Refreshing a kitchen and first floor in Dexter

Is painting kitchen cabinets worth it?

When the boxes are solid and the layout works, usually yes. On this job, refinishing all 16 cabinets cost about $10,800 in labor and materials. If the boxes are failing or you want a new layout, replacing them is the better call.

Can you install flooring we already bought?

Yes. The Fishers supplied their own vinyl plank, and the proposal priced only the labor, underlayment, transitions and trim. It helps to confirm the product and the quantity before demolition so the job doesn’t stall halfway.

How long does a project like this take?

This one ran through the winter of 2025, with invoices from late January to mid-March. The countertops come last in the sequence because the fabricator measures after the cabinets are finished. Our open floor plan page covers the bigger version of this job, when walls do come out.

Ready to refresh your first floor?

Tell us what you’d keep and what you’d change. We’ll price every line in writing and handle the trades from demolition to the last piece of trim.